Loading project data…Please wait while SIMMS switches the active project context.
Dashboard
Mine performance overview from verified operational and survey data.
Performance As OfUpdates automatically
Production Performance
Waste / OB Removal · BCM
MTD · Operational Estimate
Estimate-
Official SurveyPending
Reconciliation—
Plan-
Est. Achievement-
YTD · Official Survey
Official-
Closed Months-
SourceSurvey
Coal Production · Ton
MTD
Actual-
Plan-
Achievement-
YTD
Actual-
Plan-
Achievement-
Current Performance
Latest Hourly Performance
Waste / OB
-
Coal
-
Open Hourly Productivity →
Equipment PA
Waste / OBNo verified data
—
CoalNo verified data
—
Open Equipment & Fleet →
Fuel MTD
Waste / OBNo verified fuel
—
CoalNo verified fuel
—
Open Fuel & Efficiency →
Management Intelligence
PRODUCTION PERFORMANCE TREND
Actual vs Governed Plan
MTD
Waste / OB
BCM/dayPlan unavailable
Coal
Ton/dayPlan unavailable
ACTUAL STRIPPING RATIO—BCM/Ton
GOVERNED PLAN—BCM/Ton
Plan unavailableDerived from verified Waste / OB BCM ÷ verified Coal Ton.
OPERATIONAL PRODUCTIVITY & LOSS
What changed and why
Waste / OB Hourly ProductivityPhysical hour
Site PA—
Site UA—
LOSS / CONTEXT CONTRIBUTORS
PRODUCTION BRIDGE
FUEL EFFICIENCY TREND
Fuel Ratio & Equipment Consumption
RECORDED FUEL USAGE
SUGGESTED ATTENTION
SIMMS-detected signals
Decision Support
SIMMS detects and explains evidence. It does not create a formal Management Recommendation automatically.
Recommendations & Actions
Active Recommendations
0
Pending Client Decision
0
Overdue Actions
0
Critical Actions
0
Management Exceptions
Area
Status
Evidence / Cause
Owner
Priority
Action
Production
Management view is performance-first. Use Production Records only when source/detail traceability is required.
Production Loss Analysis
Sequential bridge from Target → PA → UA → Productivity → Operational Actual. Event contributors explain the loss without double counting; Fuel stays a parallel cost driver.
Period End
Period
Material
Scope
Scope Key
PA CONTRIBUTORS
UA CONTRIBUTORS
PRODUCTIVITY CONTRIBUTORS
Cost Pressure Drivers
Production Records
Supporting operational source records, verification status and traceability.
Date
Material
Status
Operational Date
Hour
Shift
Contractor
Fleet
Material
Haul Trips / Factor
Quantity
Status
Action
Hourly Productivity
Current Waste and Coal productivity by physical hour. ⓘ
Performance Date
Shift
View
Waste · BCM/hr
Waste
Target
Latest Actual--
Target-
Achievement-
Projected Shift-
Coal · Ton/hr
Coal
Target
Latest Actual--
Target-
Achievement-
Projected Shift-
Waste Hour-by-Hour
Coal Hour-by-Hour
View Hourly Details
Equipment & Fleet
Verified unit performance, PA and UA. ⓘ
Performance DateVerified records only
Units with Verified Data
-
Site PA
-
Site UA
-
Availability Exceptions
-
PA or UA below target
Unit
Type
Contractor / Fleet
Material
Production
Productivity
PA
UA
Status
Contractor Performance
Management summary by executing contractor. Performance period: —
Contractor
Material
Production
Achievement
Units
Avg PA
Critical / Amber
Fuel Issued MTD
Open HSE
Fuel & Efficiency
Mine-management fuel analysis from recorded physical fuel issues, SIMMS operational time, meter readings and production. Odometer is never converted to Hour Meter.
Recorded fuel issues · operational working-time analysis
Total Fuel Issued
-
Waste / OB Fuel Ratio
-
L/BCM
Coal Fuel Ratio
-
L/Ton
Units with Consumption Rate
-
L/h for Hour Meter · L/km for Odometer
Individual Equipment
Unit
Type / Activity
Contractor / Fleet
Fuel
Meter
Working Hours
Consumption Rate
L/Production
Fuel by Activity
Activity
Material
Units
Fuel Issued
Record Count
Survey & Mine Progress
Latest survey results, mine progress, monthly volumes and reconciliation.
Latest Weekly Map
-
Verified survey campaign
Monthly OB Survey
-
Cut volume
Coal Expose
-
Coal Stockpile Opname
-
Survey Campaigns & Maps
Campaign
Type
Period
Date
Area
Method
Status
Action
Survey Quantities
Period
Measure
Area
Quantity
Method
Source
Status
Monthly Reconciliation
Period
Material
Operational Estimate
Survey Measured
Variance
Status
Detail
Mine Progress Map
View verified survey and mine progress spatial data.
Selected Spatial Object
Click a map object
Object details appear here.
Survey Workbench
Record routine survey results and monthly opname for Survey Head verification. Routine survey work, including monthly opname, does not require SIMMS pre-approval.
Loading governed Survey Entry masters...
Survey Record
For routine, weekly and supporting Survey work. SIMMS generates campaign/technical references automatically.
Technical Details
Coordinate system and vertical datum are inherited from Project Survey Configuration. Physical acquisition time defaults to the Survey Date unless a specific time is entered.
Monthly Opname
Record the completed closing survey. Previous closing surface and official cut-off are resolved by SIMMS.
Auto-resolved to the actual last calendar day of the production month (28/29/30/31).
Governed monthly boundary at 00:00.
Resolved automatically from the prior verified closing surface.
Select Production Month and Area to resolve the official closing context.
Measurement / Cut-off Adjustment Details
My Recent Survey Submissions
Type
Date/Month
Area
Method
Result
Status
Manage
My Returned Survey Records
Records returned by Survey Head remain governed records. Review the specific correction reason, revise the same record, and resubmit it for verification.
Type
Record
Campaign / Context
Current Details
Revision
Correction Reason
Returned By / At
Action
Verified Surface Cut-off Governance Required
Legacy Verified Surfaces are preserved, but SIMMS will not assume whether activity occurred between the Official Cut-off and the physical survey. Submit an assessment before using the Surface in Monthly Opname.
Surface
Campaign / Area
Official Cut-off
Physical Acquisition
Assessment Status
Action
Technical / Legacy Survey Tools
Advanced technical tools are retained for special cases and audit recovery. Normal Survey work should use the simplified forms above.
1. Register Survey Campaign / Acquisition Context
2. Data Acquisition Record
3. DTM / Surface Processing
Select a Verified Campaign first. Only acquisition evidence from that campaign is eligible.
Official Cut-off / Reference Time is the governed period boundary. Physical Acquisition Time comes from the selected verified evidence. If activity continued after cut-off, the submitted DTM/Surface must be adjusted or reconstructed to represent the cut-off boundary and the adjustment basis/reference must be recorded.
4. Monthly Surface Comparison / Waste Opname
Select Production Month and Area to resolve the governed surface chain.
Enter Cut and Fill. SIMMS calculates Survey-Measured Waste from the governed basis.
Official Monthly Waste is the verified Survey-Measured volume from comparison of the governed previous and current closing surfaces. Under the current governed Waste basis, Survey-Measured Waste equals Cut Volume; Fill is retained separately for QA/reconciliation and is not silently netted. Truck Count remains an Operational Estimate.
Other Survey Quantity (Non-Monthly / Supporting)
Quantity area is inherited from the selected governed campaign. Waste uses BCM; Coal Expose and Stockpile Coal use Ton.
Import Spatial Layer — GeoJSON
GeoJSON Point/LineString/Polygon is imported as governed spatial data. DWG/DXF may be retained as campaign source metadata pending dedicated CAD conversion engineering.
Planning & Targets
Current approved production and performance targets.
Target Revision Form
View Target History & Approval
Target revisions remain auditable. Submit Drafts for approval when ready.
Target
Scope
Material
Value
Effective
Revision
Status
Reason
Workflow
Performance Exception Thresholds
Advanced rules used only for management-exception severity. Prefer project/site defaults; use unit-specific overrides only when operationally justified.
Create Severity Rule Revision
Rule History & Approval
KPI
Scope
Material
Critical Below
Effective
Revision
Status
Reason
Workflow
Shift Schedule
Project shift configuration. Changes are infrequent and remain governed.
Create Shift Revision
Shift History & Approval
Shift
Time
Duration
Effective
Revision
Status
Reason
Workflow
Truck Factor Configuration
Field operators enter Haul Trips as simply as possible. SIMMS resolves Hauler Class + Material Condition + approved effective Truck Factor to calculate Operational Estimate BCM. Truck Factor governance is restricted to authorized production/engineering roles.
Hauler Class Master
Code
Name
Payload Ref.
Status
Material Condition Master
Code
Name
Status
Fleet → Hauler Class Assignment
Governed Truck Factor Revision
Governance
Draft → Submitted → Approved → Superseded
PM / Engineering / Technical Verifier may prepare. Approval follows hierarchy: Engineering / Technical Verifier submissions are checked by Project Manager (or SSM Director); Project Manager submissions escalate to SSM Director. Self-approval is prohibited. Historical production stores the Truck Factor snapshot used at entry time.
Nominal hauler tonnage is reference metadata only. SIMMS never auto-converts tonnage to BCM.
Hauler / Condition
Scope
Factor
Effective
Rev.
Status
Basis / Reason
Workflow
Monthly Waste Reconciliation
Reconcile the verified Monthly Opname with the retained operational estimate, record the agreed result, then perform Official Close.
Production MonthSelect a month to view its current state.
Official Monthly Waste
—
Closed
Official Waste
—
Operational Estimate
—
Variance
—
Survey Method
—
Official Cut-off
—
Joint Measurement / BA
—
View Details
Survey & Source Details
Joint Measurement / BA
Record the actual agreement date.
Reference
Month
Agreed Quantity
Agreement Date
Document
Status
Workflow
Monthly Closing History
Month
Operational Estimate
Survey Measured
Variance
Status
Action
Governed Final Action
Official Month Close
Review before closing. This action records the Survey-based Official Waste quantity for the month and activates the Waste period lock. Truck Count remains retained as the historical Operational Estimate.
Production Month—
Official Waste / Survey-Measured—
Operational Estimate / Truck Count—
Reconciliation Variance—
Finalized JMC—
Agreed Measured Quantity—
Official Cut-off—
Official Technical Source—
Closing Authority—
Period lock: after Official Close, late Waste production entry/verification/revision and Monthly Opname changes for this closed period are blocked. A governed reopening/versioned re-close workflow is required before any closed-period change.
Governance Change Log
Approved/effective project target and configuration changes, with effective date, reason and accountability.
Date
Parameter
Previous → Current
Effective
Reason
Changed / Approved By
Data Exports
Download authority follows user role and project access. Export activity is itself recorded in the audit trail.
Old value, new value, effective date, revision and reason.
Restricted Governance
Audit Log CSV
Available only to authorized SSM management/system administration roles.
Official Waste Governance
Waste Monthly Closing CSV
Truck-count Operational Estimate versus Official Survey, closing cut-off, acquisition time, variance and closing status.
Project Setup Wizard
Create and prepare a reusable Mine Management project inside SIMMS Core. A Draft project cannot accept operational transactions until all required setup gates pass and SSM Admin activates it.
1Identity
2Scope
3Mine Masters
4Targets
5Survey
6Reports
7Users
8Activate
Create New Project Draft
Selected Project Identity
Scope & Enabled SIMMS Modules
Only enabled modules become part of this project's operational navigation after activation.
Mine Technical Masters
Configure governed project masters here. Codes become stable identifiers; while the project is Draft, descriptions, relationships, targets and status may be edited. Operational transactions do not create new master identities.
3A. Contractors
Mining contractor / service-provider master and project scope.
Code
Name
Scope
Status
3B. Mine Areas
Pit, dump, stockpile, haul road and other controlled project areas.
Code
Name
Type
Status
3C. Coal Seams
Seams are linked to an existing Mine Area.
Code
Name
Mine Area
Status
3D. Fleets
Fleet is linked to Contractor and Material. Primary Excavator/Loading Unit may be assigned after the equipment unit exists.
Code
Name
Contractor
Material
Primary Loading Unit
Planned Haulers
Status
3E. Equipment Units
Equipment must reference an existing Contractor and Fleet. Material must match the Fleet.
BCM/hrWill save: 0 BCM/hrReference only. Management KPI targets must be Approved in Planning & Targets.
Unit
Class / Type
Contractor
Fleet
Material
Productivity Reference
Status
You can return to add or revise Mine Masters while the project remains Draft.
Initial Target Readiness
Target Governance
Initial production targets use the same governed lifecycle as later revisions:
Prepare → Submit → Director Approve
System Admin does not become technical target approver merely because they administer the project. If Project Manager / Director have not yet been assigned to this Draft project, complete Step 7 — Users first; wizard steps may be completed out of sequence.
Target approval may be completed later; activation remains blocked until required approved targets exist.
Survey & Spatial Configuration
Add Report Profile
Configured Report Profiles
Add every required reporting frequency before activation.
Required Project Roles
User & Role Administration
Assign named users to the project before activation. One user may hold multiple roles.
Activation remains blocked until every required role is assigned.
Project Readiness Validation
Controlled Project Activation
Activation is blocked server-side while any required setup gate remains incomplete.
Project Configuration
Operational project setup workspace. Project Manager maintains operational structure with the setup team; governed targets, Shift Schedule and Truck Factor remain in their dedicated controls.
UTC remains the system-of-record timestamp. Project Timezone changes are separately governed and audit logged.
Areas & Contractors
Contractors
Contractor
Scope
Status
Mine Areas
Area
Type
Status
Fleet & Equipment
Fleets
Optional; used for automatic Fleet production attribution.
Fleet
Contractor
Group
Status
Equipment
Unit
Class / Type
Contractor / Fleet
Group
Status
Project Scope
Enable only modules used by this project. Dependencies are validated server-side.
Current Governed Targets
Survey & Reporting Setup
User & Access Administration
SSM controls account provisioning and project roles. Deactivation is preferred over destructive deletion when governed records already reference a user.
Create User
My Password
Users
User
Organization
System Admin
Project Roles
Status
Actions
My Work Today
Field Contributor workspace. Record governed production facts only; operational Events/Conditions and Fuel are handled by their dedicated roles.
PRIMARY TASK
Equipment Hour & Performance
Enter individual hauler trips by fleet/hour. SIMMS derives Waste production from governed Truck Factor.
Returned: 0
COAL SOURCE
Coal Weighbridge
Enter verified source quantity per governed shift. Waste is not entered here.
Returned: 0
Field Contributor scope: Equipment Hour & Performance + Coal production source. Events/Weather belong to Operations Controller; Fuel belongs to Fuel Data Contributor.
Verification Workbench
Independent verification of governed production source data. Fuel transactions do not require per-transaction Technical Verification.
PRODUCTION / COAL
0
Submitted direct production source record(s)
EQUIPMENT FLEET HOUR
0
Submitted Equipment Hour & Performance package(s)
Hourly Conditions
One simple operating-condition record per physical hour. No approval workflow is required; this information provides context for hourly productivity and management review.
Recorded Conditions
Date / Hour
Shift
Area
Weather
Rainfall
Road / Ground
Remarks
Operations Control — Current Shift
Minute-level operational evidence. Record material exceptions once; SIMMS maps them to PA Loss, UA Loss or Productivity Context and prevents double counting in time accounting.
Impact class is controlled by Event Category.
Recent Events
Event
Scope
Start–End
Duration
Impact
Reason
Status
Production Entry
Waste is recorded hourly from Haul Trips × governed Truck Factor. Coal is recorded as a Weighbridge Summary per governed Shift; no artificial Production Hour is required.
Automatically resolved from governed shift schedule.
Coal weighbridge summary is recorded for the governed shift.
Reference to the shift weighbridge summary or source document.
Select contractor, fleet, material condition and enter Haul Trips to resolve governed calculation.
Loading governed project masters...
Production Verification Queue
Waste verification makes the record eligible for operational-control KPIs only; monthly Official Waste remains Survey-based. Coal verification uses Weighbridge as the official source.
ID
Date / Hour
Contractor / Area / Fleet
Basis
Calculation
Qty
Revision
Submitted By
Remarks
Status
Action
Equipment Hour & Performance
One Fleet Hour package per physical hour. Enter trips for every active hauler once; SIMMS applies governed Truck Factor, attributes Fleet output to the configured loader and derives PA/UA from Events.
My Returned Fleet Hour Packages
Package
Date / Hour
Fleet / Pit
Trips / BCM
Status
Action
Select Fleet and governed context. All active haulers in the fleet will appear below.
Individual Hauler Trips
Unit
Type
Trips This Hour
Calculated BCM
Event / Time Context
Remarks
Select a Waste Fleet.
Equipment Hour & Performance Verification
Verify one Fleet Hour package as a whole. Individual hauler trips reconcile to system-derived Waste production; Event-derived PA/UA is shown as evidence and refreshed before verification.
Package
Date / Hour
Fleet / Pit
Trips × TF
Unit Evidence
Warnings
Status
Action
Fuel Operations
Fuel Data Contributor records physical fuel movements and actual meter readings. SIMMS derives Contractor, Fleet and Activity from Equipment Master. No Odometer → Hour Meter conversion.
Fuel Issue — Equipment Refueling
QR should contain the individual Equipment Unit Code / QR ID only.
Select equipment to show previous reading.
Native equipment meter; thousand separators are accepted.
Select equipment. Contractor, Fleet, Activity and meter type are system-derived.
Fuel Receipt — Supplier
Daily Fuel Balance
Select Balance Date and Tank to preview Opening, Receipts, Issues and Expected Closing.
Opening + Receipt − Issue = Expected Closing; actual tank stock produces the variance.
Recent Fuel Issues
Date / Time
Unit
Contractor / Fleet / Activity
Fuel
Meter
Tank
Status
Recent Fuel Receipts
Date / Time
Supplier
DO Reference
Receiving Tank
Quantity
Entered By
Legacy Fuel Verification Queue
Historical compatibility only. New Fuel Man transactions are Recorded directly with audit history and do not use per-transaction Technical Verification.
Survey Verification & Reconciliation
Segregation of duties: Survey submitter cannot verify their own campaign, calculated quantity, or imported spatial layer.
Survey Submissions
Type
Date / Month
Area
Method
Result / Quantity
Status
Action
Advanced Technical Verification
Campaigns
Campaign
Type
Period
Date
Area
Source
Status
Action
Data Acquisition Records
ID
Campaign
Role
Method
Acquired
Source
Status
Action
DTM / Surface Processing
Surface
Official Cut-off / Reference
Area
DTM / Surface
Post-Cut-off Activity
Status
Action
Legacy Verified Surface Cut-off Governance
Surface
Official Cut-off
Area
Post-Cut-off Activity
Adjustment / Reference
Status
Action
Monthly Surface Comparison / Waste Opname
Month
Area
Surfaces
Cut
Fill
Survey-Measured Waste
Status
Action
Calculated Quantities
ID
Campaign
Measure
Area
Quantity
Status
Action
Spatial Layers
Layer
Type
Geometry
Source File
Status
Action
HSE Overview
Safety status plus Safety and Environment program progress. Normal progress stays here; only items needing management attention surface as Dashboard exceptions.
Evidence status: —
LTI
-
Open Significant HSE
-
Open HSE Items
-
Safety Program Progress
Program
Period
Target
Actual / Progress
Client Supply
Status
Note
Environment Program Progress
Program
Period
Target
Actual / Progress
Client Supply
Status
Note
Daily HSE Confirmations
Date
Shift
Contractor
Confirmation
Remarks
Source
HSE Events / Observations
Code
Date
Category
Severity
Contractor
Location
Summary
Status
HSE Workbench
HSE Head records daily evidence and events. A daily zero-incident confirmation is distinct from having no HSE data.
Daily HSE Confirmation
HSE Event / Observation
Available for Incident category only.
Safety / Environment Program Progress
HSE Head records target → actual/progress → status. No approval or verification workflow is required. For Safety Signage, Client/GTB supplies the signs/materials; SSM supports deployment and monitoring.
Use only when material availability from Client/GTB is relevant to this program.
Program Progress Register
Domain
Program
Period
Target
Actual
Client Supply
Status
Manage
Loading governed HSE entry masters...
Recommendations
Record the issue, discuss it through the normal management process, then record the decision. Meeting, email and phone remain part of the work process.
New Management Note / Recommendation
More details
Open
0
Awaiting Decision
0
Action in Progress
0
Closed
0
Recommendation Register
Date / Subject
Area
Priority
Discuss At
Decision
Action
Status
Manage
Awaiting My Decision
Formal Client decisions are recorded here as part of the Recommendation workflow.
Decision History
Record Management Decision
Actions
Simple follow-up tracker for decisions that require action. Actions are managed and closed by the Project Manager with completion evidence; governance and audit controls run in the background.
Open
0
In Progress
0
Overdue
0
Closed
0
Create Action
Choose a Project User when available; choose a governed external entity when the responsible PIC is outside SIMMS.
Advanced accountability (only when needed)
Action Register
Action
Responsible / PIC
Due
Status
Manage
Update Action
Edit Assignment / Due Date
Report Center
Official periodic management reports are prepared through the normal working process and stored here as the project record.
Upload Periodic Management Report
—
Periodic Report Register
Period
Report
Status
Revision
Uploaded By
Date
File
Data Exports
Download governed project data appropriate to your role. Detailed system audit remains restricted to authorized SSM management.
Operational Data
Production CSV
Project Governance
Governance Change Log CSV
Official Waste
Monthly Closing CSV
Generate SIMMS Data Snapshot
Optional supporting snapshot generated from SIMMS data; it is not a substitute for the management report.
—
Snapshot History
Report
Period
Date Range
Revision
Generated
Download
My Devices
Maximum 2 active devices per account/person. Devices -/2
A third device is blocked until one existing device is deactivated.
Device
First Seen
Last Active
Status
Action
UAT Connectivity Tool
Available only when SIMMS is opened with ?uat=1. This control is hidden during normal operation.
Advanced Audit
Detailed server-persisted business/system events for authorized SSM management.